The piping system under St Marys was installed but never connected so the system cannot be used at present.The system could be used to warm the ground to prevent freezing and also extract surplus water from the pitch to prevent floding.The heating was deemed too expensive to run and not vital due to the grounds location near the sea so he who cannot be named stopped the work.
The system is all installed so could be connected.